Then Tesla would just have GB/T, CCS1, and CCS2 benchmarks to take care of in producing. But as mentioned, the Types S and X would want layout alterations for A much bigger cost port. As of 2024 the Level 2 J1772 adapter (with NACS plug) remains made use of at https://australiassouthernmostisl98414.bloguetechno.com/southernmost-town-of-tasmania-things-to-know-before-you-buy-66701089