As seen from the figure under, constant auger is used to drill the borehole, carry up drilled soil, and pour concrete although the auger is moved up. As a result, the borehole will not need to have casing or hydrostatic pressure to avoid damage to the borehole wall. Log in https://neilu356exm7.wikidirective.com/user