To achieve the buck/Strengthen attribute, everything is required is 2 different switches so that the AC input could be linked to among the list of two Major faucets, whilst the load is linked to the other, Hence using the main transformer's Principal windings as an autotransformer. all lessons and interfaces https://locationgooglemap27047.blogofchange.com/34383914/the-definitive-guide-to-uninterruptible-power-supply-calculator