Penmann recently finalised a significant HVAC upgrade at Nutricia’s Liverpool-based production site, supplying a purpose-built ventilation and climate control system engineered to meet strict hygiene and production standards. The scope included the complete lifecycle delivery of high-specification HVAC systems across non-production, Medium Care (MC) and High Care (HC) areas. Based https://bbsocialclub.com/story22782161/penmann-delivers-major-hvac-upgrade-for-nutricia-s-liverpool-site-to-align-with-the-fsi-development-programme