Penmann successfully delivered a complex HVAC upgrade at Nutricia’s Liverpool facility, supplying a fully engineered ventilation and climate control system designed to satisfy demanding hygiene and production standards. The scope covered the design, supply, installation and commissioning of advanced HVAC systems across civil, Medium Care (MC) and High Care (HC) https://mysterybookmarks.com/story20609368/penmann-ltd-completes-specialist-hvac-installation-for-the-liverpool-based-nutricia-facility-supporting-fsi-phase-1-2